40% of railway work was completed on Zangesur corridor

The construction of the road on the Azerbaijani section of the Zangesur corridor was completed by 70%, the railway line was 40%, the special representative of the President of Azerbaijan in the Zangilalan district Vakhid Gadzhiev, speaking at the event as part of the visit of the Saudi delegation to Azerbaijan.

As Gadzhiev noted, the process of building a railway and roads continues, which is an integral part of the Zangezur corridor, which can connect the countries of the East and West.

“We have enough difficulties in the process of restoring the Eastern Zangesur, but in this regard there are great opportunities. One of the big problems was associated with clearance and safety. Ensuring safety, stability and peace is the main priority to achieve stability in cities and villages . One of the main obstacles to the restoration work and ensuring the safe return of forced immigrants to their homes was the mass pollution of the liberated territories with mines and other explosive devices. Currently continuing the process of clearance of the Eastern Zangesura, ”he added.